- SVD Status of Mechanics and Cooling
Annekathrin Frankenberger, Immanuel Gfall
Belle II General Meeting (23.12.2012)
- Belle II SVD Mechanics Rev.0
Immanuel Gfall
Belle II General Meeting (12.11.2012)
- Milestones and Schedule of SVD Construction
Markus Friedl
Belle II focused review (01.10.2012)
- Status of SVD readout electronics
Markus Friedl
Belle II focused review (01.10.2012)
- Belle II SVD Mechanics
Immanuel Gfall
Belle II Focused Review (01.10.2012)
- SVD Status of Mechanics
Immanuel Gfall
PXD-SVD Meeting (24.09.2012)
- Sensor Irradiations and Testbeam 2012
Thomas Bergauer
12th B2GM Bad Aibling (23.07.2012)
- Belle II SVD Construction Database
Thomas Bergauer
12th B2GM Bad Aibling (22.07.2012)
- DC/DC Converter Update
Markus Friedl
Belle II General Meeting (22.07.2012)
- Toward common filters, jets and MET selection
Robert Schöfbeck
CMS SUSY Workshop 2012 (06.06.2012)
- Toward commonality of W predictions
Wolfgang Kiesenhofer
CMS SUSY Workshop 2012 (05.06.2012)
- Global Trigger Upgrade Status
Babak Rahbaran
Trigger Upgrades Meeting - GT/GMT/TTC (24.05.2012)
- Electrical Q&A
Markus Friedl
Institut of Mathematics & Physics of the Universe, University of Tokyo, Japan (19.03.2012)
- SVD Status
Immanuel Gfall
Belle II General Meeting (15.03.2012)
- DC/DC Converters
Markus Friedl
Belle II General Meeting (14.03.2012)
- Trigger Upgrades Meeting-GT/GMT upgrade status
Babak Rahbaran
Trigger Upgrades Meeting - GT/GMT/TTC (08.02.2012)
- Psb_Ogti, Status and Risks for Global Trigger
Babak Rahbaran
Review of the CMS trigger optical link oGTI (08.12.2011)
- Interpretation of the SUSY searches - the simplified models effort
Wolfgang Waltenberger
CMS SUSY workshop (05.12.2011)
- Status of DSSD Sensors and Introduction to Belle Testbeam 2011
Thomas Bergauer
Xth Belle 2 General Meeting (17.11.2011)
- Belle II SVD Design Status
Immanuel Gfall
Belle II General Meeting (16.11.2011)
- Status of SVD
Markus Friedl
BPAC (Belle Program Advisory Committee) Review (12.11.2011)
- GT upgrade Plan Phase 1
Babak Rahbaran
CMS Upgrade Week and Workshop - 2011 Fermilab (08.11.2011)
- Level-1 Trigger
Claudia-Elisabeth Wulz
CMS Week, Brussels (19.10.2011)
- Testbeam with Double Metal Sensors
Marko Dragicevic
Sensor Upgrade Meeting (13.10.2011)
- CMS Level-1 Trigger for an Upgraded LHC
Dinyar Rabady
CMS Week, Brussels (11.09.2011)
- Production Process Analysis of CMS Sensors
Wolfgang Treberspurg
CMS Sensor meeting (21.07.2011)
- Belle II SVD Mechanics
Immanuel Gfall
Belle II General Meeting (07.07.2011)
- Search for Supersymmetry in events with top quarks and missing transverse energy
Natascha Hörmann
IPM Detector School, Teheran, Iran (23.05.2011)
- Global Trigger Upgrades
Babak Rahbaran
Trigger Upgrades Meeting within the May 2011 Upgrades Week (12.05.2011)
- Global Trigger upgrade Plan Phase I
Babak Rahbaran
Calorimeter-Global Trigger Upgrade WG (09.05.2011)
- Global Trigger Status
Babak Rahbaran
CMS Trigger Upgrades Meeting (20.04.2011)
- AIDA Workpackage 9.4 Silicon Tracking
Thomas Bergauer
AIDA Kick-Off meeting CERN (16.02.2011)
- SVD Mechanical Status
Immanuel Gfall
PXD-SVD Meeting (07.02.2011)
- SVD IR Mechanics
Immanuel Gfall
B2GM IR Meeting Japan (18.11.2010)
- SVD Mechanics and Cooling
Immanuel Gfall
B2GM SVD Session Japan (18.11.2010)
- b-tag at HLT
Wolfgang Adam
CMS Physics Week, Bodrum, Turkey (15.09.2010)
- Status of Double Sided Silicon Detectors
Thomas Bergauer
6th Open Meeting of the Belle II Collaboration (05.07.2010)
- 6 inch Origami Module and Front End Electronics
Christian Irmler
6th Open Meeting of the Belle II Collaboration (05.07.2010)
- CO2 Cooling for PXD/SVD
Immanuel Gfall
IDM Meeting (24.06.2010)
- Testing of Test Structures in Vienna
Thomas Bergauer
CMS Tracker week (TUPO) (04.05.2010)
- Status and Plans for the HPK Campaign
Georg Auzinger
Sensor WG Meeting (10.02.2010)
- Belle II SVD Mechanics and Cooling
Immanuel Gfall
DEPFET Meeting Prag (27.01.2010)
- Sensors with integrated Pitch Adapters
Thomas Bergauer
9th SiLC Meeting Paris (26.01.2010)
- Complex Two Higgs Doublet Model as a source of CP violation
Elena Ginina
(30.11.2009)
- Double Sided Silicon Sensors for Belle-II
Thomas Bergauer
4th Open Meeting of the Belle II Collaboration (19.11.2009)
- APV25 and Origami Scheme
Christian Irmler
4th Open Meeting of the Belle II Colaboration (19.11.2009)
- The Mechanical Structure for the SVD Upgrade
Immanuel Gfall
B2GM (19.11.2009)
- Sensors with integrated Pitch Adapters from ITE Warsaw
Marko Dragicevic
Sensor Upgrade Working Group (30.09.2009)
- LPTPC Silicon Envelope - Status & Plans
Stephan Hänsel
LCTPC collaboration meeting (21.09.2009)
- Level-1 Trigger Status during CRAFT 2009
Manfred Jeitler
CMS Physics Bologna (08.09.2009)
- DSSD update
Manfred Valentan
3rd Open Meeting of the BELLE II Collaboration, Tsukuba, Japan (09.07.2009)
- Construction and Status of the Origami Module Prototype
Christian Irmler
3rd Open Meeting of the Belle II Collaboration (08.07.2009)
- Opto-Rx Measurements for Pixel Upgrade
Markus Friedl, Manfred Pernicka
Tracker Upgrade Meeting (24.04.2009)
- Teststructure and Sensordesign: Status and Plans
Marko Dragicevic
CEC Meeting April 2009 (21.04.2009)
- Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout
Thomas Bergauer
2nd Open Meeting of the SuperKEKB Collaboration (18.03.2009)
- APV25 & Origami Status
Markus Friedl
2nd Open Meeting of the SuperKEKB Collaboration (18.03.2009)
- APV25, Clock and Trigger
Markus Friedl
2nd Open Meeting of the SuperKEKB Collaboration (18.03.2009)
- Trigger issues for the muon flux measurement
Ivan Mikulec
International CMS workshop on cosmic ray data analysis (12.03.2009)
- Precision calculations in the MSSM: H+ decay to t bbar
Hana Hlucha
HEPTOOLS Midterm Meeting - Second Annual Meeting, Lisbon, Portugal (11.03.2009)
- CP violation in associated production of a charged Higgs boson and a top quark at the LHC
Elena Ginina
"HEPTOOLS Midterm Meeting - Second Annual Meeting", Lisbon, 9-12 March 2009 (11.03.2009)
- Optimization of ILD’s very forward region with LDT 2.0
Manfred Valentan
8th SiLC Meeting, Santander, Spanien (17.12.2008)
- ILD’s tracking performance and comparison with an alternative inner tracker layout
Manfred Valentan
8th SiLC Meeting, Santander, Spanien (17.12.2008)
- Market survey for double sided silicon strip detectors
Thomas Bergauer
1st SuperBelle Open Meeting (11.12.2008)
- DAQ Scheme and Beam Test Results
Christian Irmler
1st Open Meeting of the SuperKEKB Collaboration (11.12.2008)
- Global Trigger Upgrades for SLHC
Claudia-Elisabeth Wulz
CMS Upgrade Workshop, Fermilab (19.11.2008)
- APV25 Readout, Chip Mounting, Repeater, FADC
Markus Friedl
2nd Open meeting for the proto-collaboration, KEK (04.07.2008)
- APV25 test beam results
Christian Irmler
2nd Open meeting for the proto-collaboration, KEK (04.07.2008)
- HEPHY Vienna and Belle
Markus Friedl
DEPFET at Superbelle Meeting Munich (25.06.2008)
- Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch
Thomas Bergauer
EUDET JRA1 Meeting, Univ. Geneve (21.05.2008)
- Level-1 Global Trigger for SLHC
Anton Taurok
CMS SLHC Trigger Workshop, Paris, Ecole Polytechnique (10.04.2008)
- Sensor Design for a Dual Metal Layer Readout
Marko Dragicevic
6th SiLC Meeting Torino 2007 (17.12.2007)