Mitarbeiterinnen und Mitarbeiter

zurück zur Listenansicht

DI Dr. Markus Friedl
DI Dr. Markus Friedl
Fachbereichsleiter
E-Mail-Adresse: Markus.Friedl@oeaw.ac.at
Telefon: HEPHY: +43 (1) 5447328 - 38,58
Mobil: +43-699-17251085
Raum: 311
Persönliche Homepage: friedl.hephy.at
Projekte: CMS Inner Tracker, Belle, Öffentlichkeitsarbeit
Fachbereiche: Elektronik, Werkstätte
Publikationen (Auswahl): Minimizing Dead Time of the Belle II Data Acquisition System with Pipelined Trigger Flow Control (09.10.2013)

A Low Mass On-Chip Readout Scheme for Double-Sided Silicon Strip Detectors (07.07.2013)

Observation of a new boson with mass near 125 GeV in pp collisions at sqrt(s) = 7 and 8 TeV (20.06.2013)

The Belle II Silicon Vertex Detector (05.06.2013)

Search for supersymmetry in final states with a single lepton, b-quark jets, and missing transverse energy in proton-proton collisions at sqrt(s) = 7 TeV (05.03.2013)

Measurement of the Y(1S), Y(2S) and Y(3S) polarizations in pp collisions at sqrt(s) = 7 TeV (20.02.2013)

The Belle II Silicon Vertex Detector readout chain  (15.02.2013)

Origami chip-on-sensor design: progress and new developments (09.01.2013)

Comparison of n-side strip isolation methods for silicon sensors  (22.11.2012)

Recent Progress in Sensor- and Mechanics-R&D for the Belle II Silicon Vertex Detector (15.10.2012)

The Belle II Silicon Vertex Detector (04.10.2012)

Observation of a New Xi_b Baryon (21.06.2012)

Optimization of Strip Isolation for Silicon Sensors (22.04.2012)

Inclusive b-jet production in pp collisions at sqrt(s)=7TeV (17.04.2012)

Efficient Signal Conditioning by a FIR Filter for Analog Signal Transmission over Long Lines (24.01.2012)

The Silicon Vertex Detector of Belle II (04.01.2012)

Search for supersymmetry in pp collisions at sqrt(s)=7 TeV in events with a single lepton, jets, and missing transverse momentum (31.08.2011)

The Incredible Power of an FIR Filter (18.03.2011)

Electronics and Mechanics for the Silicon Vertex Detector of the Belle II Experiment (20.12.2010)

Belle II Technical Design Report (01.11.2010)

The Phase 1 Upgrade of the CMS Pixel Front-End Driver (31.10.2010)

The Silicon Vertex Detector of the Belle II Experiment (09.03.2010)

Construction and Performance of a Double-Sided Silicon Detector Module Using the Origami Concept (19.10.2009)

Beam test results for fine pitched multigeometry silicon strip detectors (16.10.2009)

Readout and Data Processing Electronics for the Belle-II Silicon Vertex Detector (15.10.2009)

Online data processing and hit time reconstruction for silicon detector readout (14.10.2009)

Simulation of electrical parameters of new design of SLHC silicon sensors for large radii (08.10.2009)

Alignment of the CMS silicon strip tracker during stand-alone commissioning (30.07.2009)

Optimising the Strip Geometry for very Fine Pitch Silicon Strip Sensors (24.06.2009)

Performance studies of the CMS Strip Tracker before installation (09.06.2009)

Upgrade of the Belle Silicon Vertex Detector (20.04.2009)

Resolution Studies on Silicon Strip Sensors with Fine Pitch (30.01.2009)

The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors (30.09.2008)

The CMS Experiment at the CERN LHC (14.08.2008)

The CMS tracker operation and performance at the Magnet Test and Cosmic Challenge (18.07.2008)

Readout of Silicon Strip Detectors with Position and Timing Information (04.04.2008)

CMS Physics Technical Design Report, Vol. 2 (20.07.2007)

Obtaining Exact Time Information of Hits in Silicon Strip Sensors Read Out by the APV25 Front-End Chip (01.05.2007)

Occupancy Reduction in Silicon Strip Detectors with the APV25 Chip (10.12.2006)

Belle Silicon Vertex Detector for the Super B Factory (10.12.2006)

Improvement of Particle Identification by Energy Loss in a Stack of Silicon Detectors (30.09.2006)

Time Resolution of a Few Nanoseconds in Silicon Strip Detectors Using the APV25 Chip (25.09.2006)

Final Results of the Industrial Production of CMS Tracker Analog Optohybrids (12.09.2005)

The effect of highly ionising particles on the CMS silicon strip tracker (11.05.2005)

Performance of a CMS silicon strip detector module with APV25 readout (01.08.2002)

Test of the CMS Silicon Strip Detectors in the Hadron Beam (01.08.2002)

A simple model of charge collection in silicon detectors (01.08.2001)

Vorträge (Auswahl): The Belle II Silicon Vertex Detector (13.02.2013)

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors (13.02.2013)

Milestones and Schedule of SVD Construction (01.10.2012)

Status of SVD readout electronics (01.10.2012)

The Belle II Silicon Vertex Detector Readout Chain (19.09.2012)

DC/DC Converter Update (22.07.2012)

Illuminati - Fiktion und Fakten (18.06.2012)

Minimizing Dead Time of the Belle II Data Acquisition System with Pipelined Trigger Flow Control (14.06.2012)

Silicon Detector Readout (14.06.2012)

Illuminati - Fiktion und Fakten (27.03.2012)

Electrical Q&A (19.03.2012)

DC/DC Converters (14.03.2012)

LHC: Die größte Maschine der Welt (26.01.2012)

ILLUMINATI - Fiktion & Fakten (25.01.2012)

Status of SVD (12.11.2011)

Efficient Signal Contitioning by an FIR Filter for Analog Signal Transmission over Long Lines (29.09.2011)

ILLUMINATI - Fiktion & Fakten (29.06.2011)

Belle II Silicon Vertex Detector  (21.06.2011)

The Silicon Vertex Detector of the Belle II Experiment (15.06.2011)

The Belle II Silicon Vertex Detector (10.06.2011)

Strahlung aus dem All (24.05.2011)

The Phase 1 Upgrade of the CMS Pixel Front-End Driver (23.09.2010)

Electronics and Mechanics for the Silicon Vertex Detector of the Belle II Experiment (23.09.2010)

Operation of the CMS Tracker at the Large Hadron Collider (09.09.2010)

ILLUMINATI - Fiktion & Fakten (08.03.2010)

The Silicon Vertex Detector of the Belle II Experiment (17.02.2010)

Readout and Data Processing Electronics for the Belle-II Silicon Vertex Detector (24.09.2009)

Electronics 1, Electronics 2, Machine Shop (21.09.2009)

The Silicon Vertex Detector upgrade for Belle II (10.07.2009)

HEPHY-Elektronik im CMS-Experiment (04.06.2009)

ILLUMINATI - Fiktion & Fakten (03.06.2009)

Nanosecond Time Resolution for the Belle II Silicon Vertex Detector (19.05.2009)

Opto-Rx Measurements for Pixel Upgrade (24.04.2009)

APV25 & Origami Status (18.03.2009)

APV25, Clock and Trigger (18.03.2009)

Upgrade of the Belle Silicon Vertex Detector (13.03.2009)

APV25 for SuperBelle SVD (11.12.2008)

Electronics 1, Electronics 2, Machine Shop (01.10.2008)

The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors (17.09.2008)

APV25 Readout, Chip Mounting, Repeater, FADC (04.07.2008)

HEPHY Vienna and Belle (25.06.2008)

Elektronik für Nichtelektroniker (05.07.2007)

Time Resolution of a Few Nanoseconds in Silicon Strip Detectors Using the APV25 Chip (25.09.2006)

Obtaining Exact Time Information of Hits in Silicon Strip Sensors Read Out by the APV25 Front-End Chip (21.05.2006)

Belle Silicon Vertex Detector for the Super B Factory (07.11.2005)

Final Results of the Industrial Production of CMS Tracker Analog Optohybrids (13.09.2005)