| Observation of a New Xi_b Baryon (21.06.2012) Inclusive b-jet production in pp collisions at sqrt(s)=7TeV (17.04.2012) Search for supersymmetry in pp collisions at sqrt(s)=7 TeV in events with a single lepton, jets, and missing transverse momentum (31.08.2011) Belle II Technical Design Report (01.11.2010) The Phase 1 Upgrade of the CMS Pixel Front-End Driver (31.10.2010) Construction and Performance of a Double-Sided Silicon Detector Module Using the Origami Concept (19.10.2009) Readout and Data Processing Electronics for the Belle-II Silicon Vertex Detector (15.10.2009) Online data processing and hit time reconstruction for silicon detector readout (14.10.2009) Alignment of the CMS silicon strip tracker during stand-alone commissioning (30.07.2009) Performance studies of the CMS Strip Tracker before installation (09.06.2009) Upgrade of the Belle Silicon Vertex Detector (20.04.2009) The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors (30.09.2008) The CMS Experiment at the CERN LHC (14.08.2008) The CMS tracker operation and performance at the Magnet Test and Cosmic Challenge (18.07.2008) Readout of Silicon Strip Detectors with Position and Timing Information (04.04.2008) The CMS Pixel FED (08.10.2007) CMS Physics Technical Design Report, Vol. 2 (20.07.2007) Obtaining Exact Time Information of Hits in Silicon Strip Sensors Read Out by the APV25 Front-End Chip (01.05.2007) Occupancy Reduction in Silicon Strip Detectors with the APV25 Chip (10.12.2006) Belle Silicon Vertex Detector for the Super B Factory (10.12.2006) Time Resolution of a Few Nanoseconds in Silicon Strip Detectors Using the APV25 Chip (25.09.2006) Final Results of the Industrial Production of CMS Tracker Analog Optohybrids (12.09.2005) The effect of highly ionising particles on the CMS silicon strip tracker (11.05.2005) Performance of a CMS silicon strip detector module with APV25 readout (01.08.2002) |